wie können wir ihnen helfen?

Zentrale: 089 | 21 666 90 - 0
projektmanagement(at)argos-gmbh.eu

DEHOGA commercial building

Project control

Objektbeschreibung

The Bavarian hotel and restaurant association DEHOGA Bayern obtains a new and representative place of business with the new construction of an office and commercial building in the Maxvorstadt area of Munich.

The current design is based on an efficient and functional utilisation of the plot of land. Building depths and window axes are adapted to a contemporary measure to allow flexible interior organisation and floor plan design. Selection of technical equipment is based on energy efficiency and sustainability considerations, while planning takes into account ecological and economic aspects. Certification by the German Sustainable Building Council (DGNB – Deutsche Gesellschaft für Nachhaltiges Bauen) is aimed for. This not only means fulfilment of the energy saving ordinance ENEV 2012, but also of many criteria that measurably contribute to a sustainably more economical building operation.

All in all, this allows attainment of a high degree of flexibility, fungibility and retention of value, also for the future. The total gross floor area of about 7,000 m² of office space created is partly for use by DEHOGA and partly for free rental. The object is characterised by a very high-quality appearance. Façade design features natural stone and floor-to-ceiling window elements. Colour differentiation of the lower storeys as a base section reinforces the horizontal character of the building.

 

AUFTRAGGEBER:
Bavarian hotel and restaurant association DEHOGA Bayern e.V.
ART DER LIEGENSCHAFT:
Office building
UNSERE LEISTUNGEN:
Cost and schedule controlling as well as quality inspection and claim management for the new commercial building
Kennzahlen:
Investment volume:
ca. 20,000,000 €
Gross floor space:
ca. 7,000 m²
Termine:
Planung:
01/12 - 04/13
Ausführung:
05/13 - 06/15
Nutzer:

Office space for DEHOGA

Office space for free rental